Chaudière à vapeur de gaz/huile de combustible du rendement élevé 0,5~20 T/H avec le contrôleur intelligent
Applications de production : fourniture de vapeur pour les applications industrielles, fourniture d'eau chaude via un éc
Description
Informations de base.
Numéro de modèle. | WNS0,5-20 |
Emplacement du tambour | Chaudière horizontale |
Pression | Pression |
Style de gravure | Chaudière à combustion à chambre |
Usage | Industriel |
Structure de la chaudière | Horizontal |
Matériau du tube de fumée | GB3087 20, Toasme égal SA210 |
Isolation | Laine de silicate d'aluminium |
Revêtement de protection | Feuille d'acier inoxydable ou d'aluminium |
Conception | 3 passes, dos mouillé, tube de fumée |
Carburant applicable | Gaz, fioul, bicarburant |
Matériau de la coque | GB713 Q245r, égal à Asme SA 516 |
Spécification de l'électricité | 3/380/50, 3/400/60, 3/440/60, 3/220/60 |
Capacité de la chaudière | 35 Bhp~1400 Bhp |
Pression de travail nominale | 0,7 ~ 1,6 MPa (7 bars ~ 16 bars) |
Forfait Transport | Film étirable et caisses en bois |
spécification | 0,5 t/h ~ 20 t/h |
Marque déposée | Dévouement |
Origine | Canton |
Code SH | 84021900 |
Capacité de production | 100 ensembles/mois |
FAQQ1: Where is your company?A1: We are located in Guangzhou which is famous for international business and worldwide renowned Canton fair is held twice each year, it's the nearer and less cost to reach ports of Southeast Asia, Africa, Middle East, South America, Oceania and Europe.Q2: What is the Warranty for the boilers?A2: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier. Q3: How about the installation and commissioning?A3: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or internet online assistance. However, our service team members also are available for travelling upon request from customers. Q4: What's the production lead time for delivery?A4: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for non-pressure boilers. For non-standard products, time will be different subject to the specifications of pressure, electricity, fuel, capacity, etc. Q5: What about your payment term?A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount. Q6: What kind of documents will be provided?A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request. Q7: What's your MOQ?A7: Only 1 set, if you have more than that, you will get a more favorable price. Q8: How's the packaging & shippingA8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For gas/oil boilers, bigger than 5 ton/hr or 3.5 MW can't be loaded into standard container.
Suivant: L’offre des fabricants est faible
Notre contact
Envoyer maintenant